Ice and Water Shield Calculator

An 80 ft eave with a 12 in. overhang and a 6 in 12 pitch needs 2 rows of ice and water shield, 161 linear feet and 3 rolls, and this calculator finds the same three numbers for your roof. Planning estimate only. Check your local code and the manufacturer's instructions: they have the final word. This page does not promise that a roof will stay watertight.

Enter your eave and your roll

Add up every eave edge you cover, measured along the roof edge. 80 is only an example.

6 means 6/12. 6 is only an example.

From the outside face of the wall to the roof edge, as a flat distance. 12 is only an example.

IRC R905.1.2 asks for at least 24 in. inside the exterior wall line; this calculator takes it as a flat distance. Some towns measure from the inside face of the wall or ask for more: check your local code.

Sizes and laps come from the data sheets and instructions named on this page. The side lap is the overlap between rows, the end lap the overlap where two pieces meet.

Optional: a minimum distance from your local code, valleys and other details that need membrane too.

Only if your local code adds one, measured along the roof from the eave edge. The longer of this and the wall-line distance is used. Leave blank to skip.

A whole number. Leave blank to skip.

Along the valley. Leave blank to skip.

Feet of roll for a chimney, skylight or wall joint, cut to your own plan. Leave blank to skip.

Adds a margin on top of the footage. Use 0 for the exact figure.

Planning estimate only. Check your local code and the manufacturer's instructions: they have the final word. This page does not promise that a roof will stay watertight.

Rolls needed

3 rolls

2 rows up the roof · 161 linear feet of membrane

12 in.24 in.40.2 in. along the roof
The coloured band is the membrane. The dashed line on the left is the exterior wall line and the one on the right is where the barrier ends. The two numbers underneath are flat distances.
Your eave
Eave length80 ft
Flat distance from the roof edge36 in. (12 overhang + 24 past the wall line)
Same distance along the roof at 6/1240.2 in.
RollGAF StormGuard, 36 in. wide, 66.7 ft long
Laps used3 in. side lap, 6 in. end lap
Rows up the roof2 (cover 69 in.)
One row, with end laps80.5 ft (2 pieces)
All the rows161 ft
Membrane needed161 ft
Rolls3 (600 sq ft of membrane in all)
Rows at other pitches, with your overhang and roll
PitchAlong the roofRows
3/1237.1 in.2
4/1237.9 in.2
6/1240.2 in.2
8/1243.3 in.2
10/1246.9 in.2
12/1250.9 in.2

Distance along the roof = (overhang + distance past the wall line) × √(12² + pitch²) ÷ 12, the way this calculator converts the code distance to a distance along the roof slope. Rows = 1 + the whole number above (distance − roll width) ÷ (roll width − side lap). Each row is cut from the roll in pieces that overlap by the end lap, and offcuts are used to start the next row. IRC R905.1.2 asks for the ice barrier to reach at least 24 inches inside the exterior wall line; your town may measure it differently or ask for more, so check your local code.

Planning estimate only. Check your local code and the manufacturer's instructions: they have the final word. This page does not promise that a roof will stay watertight.

How do I figure ice and water shield for the eaves?

Find how far up the roof the barrier must reach, divide by the roll width for the rows, multiply by the eave length, and divide by the roll length. Take an 80 ft eave, a 12 in. overhang, 24 in. past the wall line and 6 in 12.

  1. Flat distance: 12 + 24 = 36 in., which is 40.2 in. along the roof.
  2. A 36 in. roll covers 36 in.; a second row overlapping by 3 in. reaches 69 in., so 2 rows.
  3. A row of 80 ft is longer than a 66.7 ft roll, so it takes 2 pieces with a 6 in. end lap, 80.5 ft.
  4. 2 rows × 80.5 ft = 161 ft, and 161 ÷ 66.7 = 2.41, so 3 rolls.

How far up the roof does it have to go?

IRC 2018 section R905.1.2, as quoted by the City of Firestone, Colorado (not less than 24 inches (610 mm)), runs the ice barrier from the lowest edges of the roof to a point inside the exterior wall line; Montana's 2012 IRC edition says "at least 24 inches". The code measures to a point inside the wall line, which reads as a plan distance; the sources do not say so explicitly.

This calculator converts the flat distance to the length along the slope, which is longer.

Along the roof = flat distance × √(12² + rise²) ÷ 12

At 6 in 12, 36 in. flat is 40.2 in. along the roof, and at 12 in 12 it is 50.9 in. That can add a row: 54 in. flat takes 2 rows at 6 in 12 and 3 at 12 in 12. Find your pitch with the roof pitch calculator or this guide, and the shingles with the roofing calculator or the guide on bundles of shingles in a square.

Does my local code ask for something different?

Check your local code. Massachusetts keeps the 24 inch rule and adds that on roofs of 8 in 12 or steeper the barrier must also reach 36 inches measured from the eave edge, without saying if that is flat or along the roof. GAF says at least 24 in. past the interior warm inside wall, and Owens Corning says 24 in. inside the exterior wall. For a local rule, type its distance in the minimum distance box, in inches along the roof; the longer distance is used.

How much does one roll cover?

GAF lists 200 sq ft for its 36 in. by 66.7 ft roll, excluding laps, and says installed coverage will be lower. With a 3 in. side lap and a 6 in. end lap, a roll nets 182.05 sq ft.

Roll sizes and laps in the manufacturer documents read for this page
RollSizeSide lapEnd lap
GAF StormGuard36 in. × 66.7 ft3 in. at least6 in.
Owens Corning WeatherLock G3 ft × 66.7 ft3 in.6 in. at least
CertainTeed WinterGuard Sand3 ft × 65 ft6 in.6 in.
CertainTeed WinterGuard Granular3 ft × 65 ft4 in.6 in.
CertainTeed WinterGuard Sand X3 ft × 65 ft3 in.6 in.

Pick a listed roll or type your own, and read its instructions.

How do I figure it from an area?

Divide the area, plus any extra, by the net coverage of a roll: 500 sq ft at 182.05 sq ft net is 3 rolls, and with 10% extra, 550 sq ft makes 4 rolls.

What about valleys and other details?

Two valleys of 20 ft add 40 ft, taking the example to 201 ft and 4 rolls. Owens Corning says the roll stays whole and extends 18 in. on each side of a valley, and GAF gives a 6 in. minimum overlap in valleys. Type your own allowance for chimneys or skylights.

What does the calculator leave out?

It estimates material, not performance: no fasteners, drip edge or rakes, and no promise that a roof stays watertight. Planning estimate only. Check your local code and the manufacturer's instructions: they have the final word. This page does not promise that a roof will stay watertight.

Sources

All read on November 27, 2026.

Ice and Water Shield Calculator FAQ

How many rolls of ice and water shield do I need for my eaves?

Rows times eave length, plus end laps, divided by the roll length. The 80 ft eave at 6 in 12 takes 161 ft, which is 3 rolls of 66.7 ft.

How far up the roof does ice and water shield go?

To a point at least 24 inches inside the exterior wall line, in the IRC wording quoted by state and city documents. Check your local code, which may ask for more.

Is the 24 inches measured along the roof or flat?

The code measures to a point inside the wall line, which reads as a plan distance; the sources do not say so explicitly. This calculator converts it to the slope: 36 in. flat is 40.2 in. at 6 in 12.

How wide is a roll of ice and water shield?

The GAF, Owens Corning and CertainTeed rolls read here are 36 in. (3 ft) wide and 65 to 66.7 ft long.

How do I add valleys to an ice and water shield estimate?

Add the valley length to the eave feet before dividing by the roll length. Two 20 ft valleys add 40 ft and move the example from 3 to 4 rolls.

Last updated . Free to use, no sign-up. How we check our numbers.