How do I figure ice and water shield for the eaves?
Find how far up the roof the barrier must reach, divide by the roll width for the rows, multiply by the eave length, and divide by the roll length. Take an 80 ft eave, a 12 in. overhang, 24 in. past the wall line and 6 in 12.
- Flat distance: 12 + 24 = 36 in., which is 40.2 in. along the roof.
- A 36 in. roll covers 36 in.; a second row overlapping by 3 in. reaches 69 in., so 2 rows.
- A row of 80 ft is longer than a 66.7 ft roll, so it takes 2 pieces with a 6 in. end lap, 80.5 ft.
- 2 rows × 80.5 ft = 161 ft, and 161 ÷ 66.7 = 2.41, so 3 rolls.
How far up the roof does it have to go?
IRC 2018 section R905.1.2, as quoted by the City of Firestone, Colorado (not less than 24 inches (610 mm)), runs the ice barrier from the lowest edges of the roof to a point inside the exterior wall line; Montana's 2012 IRC edition says "at least 24 inches". The code measures to a point inside the wall line, which reads as a plan distance; the sources do not say so explicitly.
This calculator converts the flat distance to the length along the slope, which is longer.
Along the roof = flat distance × √(12² + rise²) ÷ 12
At 6 in 12, 36 in. flat is 40.2 in. along the roof, and at 12 in 12 it is 50.9 in. That can add a row: 54 in. flat takes 2 rows at 6 in 12 and 3 at 12 in 12. Find your pitch with the roof pitch calculator or this guide, and the shingles with the roofing calculator or the guide on bundles of shingles in a square.
Does my local code ask for something different?
Check your local code. Massachusetts keeps the 24 inch rule and adds that on roofs of 8 in 12 or steeper the barrier must also reach 36 inches measured from the eave edge, without saying if that is flat or along the roof. GAF says at least 24 in. past the interior warm inside wall, and Owens Corning says 24 in. inside the exterior wall. For a local rule, type its distance in the minimum distance box, in inches along the roof; the longer distance is used.
How much does one roll cover?
GAF lists 200 sq ft for its 36 in. by 66.7 ft roll, excluding laps, and says installed coverage will be lower. With a 3 in. side lap and a 6 in. end lap, a roll nets 182.05 sq ft.
| Roll | Size | Side lap | End lap |
|---|---|---|---|
| GAF StormGuard | 36 in. × 66.7 ft | 3 in. at least | 6 in. |
| Owens Corning WeatherLock G | 3 ft × 66.7 ft | 3 in. | 6 in. at least |
| CertainTeed WinterGuard Sand | 3 ft × 65 ft | 6 in. | 6 in. |
| CertainTeed WinterGuard Granular | 3 ft × 65 ft | 4 in. | 6 in. |
| CertainTeed WinterGuard Sand X | 3 ft × 65 ft | 3 in. | 6 in. |
Pick a listed roll or type your own, and read its instructions.
How do I figure it from an area?
Divide the area, plus any extra, by the net coverage of a roll: 500 sq ft at 182.05 sq ft net is 3 rolls, and with 10% extra, 550 sq ft makes 4 rolls.
What about valleys and other details?
Two valleys of 20 ft add 40 ft, taking the example to 201 ft and 4 rolls. Owens Corning says the roll stays whole and extends 18 in. on each side of a valley, and GAF gives a 6 in. minimum overlap in valleys. Type your own allowance for chimneys or skylights.
What does the calculator leave out?
It estimates material, not performance: no fasteners, drip edge or rakes, and no promise that a roof stays watertight. Planning estimate only. Check your local code and the manufacturer's instructions: they have the final word. This page does not promise that a roof will stay watertight.
Sources
All read on November 27, 2026.
- Montana Department of Labor and Industry, Technical Advisory T1-16, September 28, 2016, bsd.dli.mt.gov: IRC 2012 edition, "at least 24 inches".
- City of Firestone, Colorado, Reroof Requirements 2018 IRC, revised August 11, 2023: R905.1.2 (2018).
- Commonwealth of Massachusetts, Ice Barrier Requirements, 780 CMR: the added 36 inch rule.
- GAF, StormGuard data sheet RESUL116-0825 and instructions RESUL192.
- Owens Corning, WeatherLock G brochure 501476A (September 2023) and instructions 10009790-A (October 2019).
- CertainTeed, WinterGuard product data, © 11/24.
Ice and Water Shield Calculator FAQ
How many rolls of ice and water shield do I need for my eaves?
Rows times eave length, plus end laps, divided by the roll length. The 80 ft eave at 6 in 12 takes 161 ft, which is 3 rolls of 66.7 ft.
How far up the roof does ice and water shield go?
To a point at least 24 inches inside the exterior wall line, in the IRC wording quoted by state and city documents. Check your local code, which may ask for more.
Is the 24 inches measured along the roof or flat?
The code measures to a point inside the wall line, which reads as a plan distance; the sources do not say so explicitly. This calculator converts it to the slope: 36 in. flat is 40.2 in. at 6 in 12.
How wide is a roll of ice and water shield?
The GAF, Owens Corning and CertainTeed rolls read here are 36 in. (3 ft) wide and 65 to 66.7 ft long.
How do I add valleys to an ice and water shield estimate?
Add the valley length to the eave feet before dividing by the roll length. Two 20 ft valleys add 40 ft and move the example from 3 to 4 rolls.