Before you dig: height, permit and engineer
Settle the height first, because it decides whether this is a weekend project or a designed structure. The Concrete Masonry and Hardscapes Association (CMHA, the former NCMA) says unreinforced segmental walls typically can be built up to 3 to 4 ft high, and less on poor soil or when the wall carries an extra load. Above that, CMHA says the designer should consider a reinforced wall, with layers of geogrid laid into the backfill.
Permits follow the same line. CMHA points to Section 105.2 of the International Building Code, which requires a permit for earth retaining structures over 4 ft in total height. The exemption in the model code reads "not over 4 feet in height measured from the bottom of the footing to the top of the wall, unless supporting a surcharge ...". A surcharge is an extra load on the soil behind the wall; CMHA gives sloping backfill and live loads as examples.
For engineering, the 2025 California Residential Code (Section R404.4, which follows the International Residential Code) requires walls that are not laterally supported at the top and retain more than 48 in of unbalanced fill, or walls over 24 in tall that resist lateral loads in addition to soil, to be designed with accepted engineering practice and a safety factor of 1.5 against sliding and overturning. The thresholds depend on the code edition your area has adopted. CMHA adds that a qualified engineer should design any segmental wall with surcharge or live loads, or on a poor foundation.
Check locally: cities set their own limits. Renton, Washington, for example, requires a permit for walls 48 in or taller from the bottom of the footing and a Professional Engineer for any wall taller than 48 in. Your building department has the last word.
Two measuring traps catch people. Codes measure from the bottom of the footing, so a wall that shows 3 ft above the lawn may measure 4 ft from the bottom of its base if your building department counts the base as the footing. And if you need more height, CMHA says two terraced walls act on their own only when the distance between them is at least twice the height of the lower wall; closer than that, they are designed as one taller wall.
Materials and tools
- Segmental retaining wall blocks, plus cap units and whatever the block maker specifies to fix them. Count the blocks with the retaining wall calculator.
- Crushed, angular gravel for the leveling pad and for the drainage zone (block makers call it wall rock). Size both with the gravel calculator.
- A perforated drain pipe when the wall needs one (see the drainage section).
- Geogrid, only if a design calls for it.
- A walk-behind vibrating plate compactor; CMHA prefers one of at least 250 lb close to the wall.
- Stakes, string line, a 4 ft level, a dead blow hammer, a shovel and a masonry saw or block splitter.
Ask the supplier for the face size of the block (length along the wall and height of one course) and its depth from front to back. Face size drives the block count; depth drives how wide the pad has to be.
Step by step: building the wall
- Call 811. The Common Ground Alliance says anyone who plans to dig should contact 811, the free national before-you-dig service, a few business days ahead so buried lines are marked.
- Lay out the wall. Mark the front edge with stakes and string, or a garden hose for curves. Strip grass, roots and topsoil; Allan Block notes that organic material cannot be used as backfill.
- Dig the base trench. Start at the lowest point. Allan Block's basic installation calls for a trench 24 in wide, 6 in deep for the base plus 1 in for each foot of wall height for buried block, and its embedment guideline sets a minimum of 6 in of buried block. Compact the trench bottom with at least two passes, and replace soft clay or wet soil with compacted granular fill.
- Build the leveling pad. CMHA calls for a pad at least 6 in thick that extends about 6 in past the front and back of the bottom block. Rake, compact and check it for level along its full length. Below about 4 ft of wall, Allan Block accepts a narrower 18 in trench with 4 in of base.
- Set the first course. Center the blocks on the pad, check level side to side and front to back, and tap them down with the dead blow hammer. Allan Block allows up to 0.5 in of coarse sand under a block to shim it. Any error here grows with every course above, so take your time.
- Drain and backfill the first course. Fill the block cores and a zone 12 in deep behind the blocks with drainage stone up to the top of the course. Put native soil in front of the wall, then backfill behind the stone and compact.
- Stack the next courses. Stagger the vertical joints by at least a quarter of a block, sweep each block top clean, and repeat the stone, backfill and compaction for every course. CMHA's limit is lifts of 8 in or less, and within 3 ft of the wall only hand-operated or walk-behind equipment.
- Cap and finish. Fix the caps the way the block maker specifies. Allan Block fills behind the last course with organic soil instead of stone.
Drainage behind the wall
The drainage stone zone lets water that seeps into the ground drain out instead of building up behind the blocks. CMHA says the gravel fill should extend at least 12 in behind the units whatever the block type, and open block cores are filled with gravel too, which adds weight and shear strength.
A perforated drain pipe at the back of the base is not always required. Allan Block requires one for reinforced walls, for gravity walls over 4 ft and on sites with poor drainage, placed at the lowest practical point toward the back of the trench and vented to daylight every 50 ft. If water collects behind your wall (a downspout, a slope draining toward it, heavy clay), add the pipe even on a short wall.
Do not aim gutters or a downspout at the top of the wall. On weak soil, Allan Block advises consulting a local geotechnical engineer, and CMHA wants a qualified engineer for any wall on a poor foundation.
Worked example: a 24 ft garden wall, 3 ft high
A 24 ft long wall, 3 ft visible, built with blocks that have a 12 × 6 in face and 12 in depth, one 6 in course buried, and 5% extra, as in the retaining wall calculator:
- Courses: (36 in + 6 in) ÷ 6 in = 7
- Blocks per course: 24 ft ÷ 1 ft = 24
- Blocks: 7 × 24 = 168, or 177 to order with 5% extra
- Leveling pad, 24 in wide and 6 in thick: 24 × 2 × 0.5 = 24 cu ft, or 0.89 cubic yards (about 1.24 tons at 1.4 tons per cubic yard)
- Drainage zone, 12 in deep over the 3.5 ft of block: 24 × 3.5 × 1 = 84 cu ft, or 3.11 cubic yards (about 4.36 tons), plus the stone for the block cores
The trench goes 12 in below the ground in front: 6 in of pad and 6 in of buried block. Measured from the bottom of the pad to the top of the blocks, this wall is 4 ft, right at the model code exemption if your department counts the pad, and a cap would push it over. Ask your building department how it measures before you order.
The drainage figure is an upper bound, because the soil behind the last course is organic soil instead of stone. Gravel is sold loose and settles when compacted, so round the order up rather than down.
Wall height, courses and what changes
The table below uses the same 12 × 6 in face and one buried course as the example, for a 24 ft wall. The third column adds the 6 in leveling pad, for departments that count the pad as the footing, since the model code exemption measures from the bottom of the footing. Past 4 ft there, expect a permit.
| Visible height | Total block height | With a 6 in pad | Courses | Blocks to order |
|---|---|---|---|---|
| 1.5 ft | 2 ft | 2.5 ft | 4 | 101 |
| 2 ft | 2.5 ft | 3 ft | 5 | 126 |
| 2.5 ft | 3 ft | 3.5 ft | 6 | 152 |
| 3 ft | 3.5 ft | 4 ft | 7 | 177 |
| 3.5 ft | 4 ft | 4.5 ft | 8 | 202 |
The maximum height of a wall without geogrid depends on the block, not on a single number. Belgard's technical note on gravity walls lists maximums from 3.0 ft to 4.5 ft for its units 8 to 12 in deep, embedment included, and only for soil with a friction angle of at least 34 degrees and a moist unit weight of no more than 120 lb per cubic foot. Its own words: there is no "typical" gravity wall height for any modular block, and the chart "should not be used for design or construction." Ask the block maker for the engineered limit for your block and site.
Deeper blocks, more setback per course, firm granular soil and level ground behind the wall all raise the safe height. Clay, a slope above the wall, a slope below it, a driveway or a fence on top all lower it.
Mistakes that make walls lean or fail
- A thin or soft base. Skipping compaction or setting blocks on dirt lets the bottom course settle unevenly, and every course above follows it.
- No drainage stone. Backfilling with the clay you dug out traps water against the blocks. Keep the 12 in stone zone all the way up.
- Backfilling all at once. Dumping 3 ft of soil and compacting the top leaves loose fill below. Work in lifts of 8 in or less.
- Heavy equipment against the wall. A large compactor or a skid steer near the face can push blocks out. Stay with walk-behind tools within 3 ft.
- Measuring height from the lawn. The code measures from the bottom of the footing, and your building department decides whether the pad and buried course count. Ask before you order.
- Stacking terraces too close. Two short walls closer than twice the lower wall's height load each other like one tall wall.
For a freestanding garden wall or a mortared wall of standard hollow units, the method is different; the cinder block sizes guide and the concrete block calculator cover those units. Building a patio at the foot of the new wall? See how to lay pavers. To price the wall, enter your block size and the price per block in the retaining wall calculator.
Frequently asked questions
Do I need a permit for a 3 foot retaining wall?
Often not, but it depends on how it is measured and what it holds back. The model code exemption covers walls not over 4 ft from the bottom of the footing to the top, unless they support a surcharge. A 3 ft visible wall can reach 4 ft if your building department counts its base and buried course, so ask yours.
What goes behind a block retaining wall?
At least 12 in of clean crushed drainage stone directly behind the blocks, the same stone in the block cores, then compacted soil behind the stone. On the last course, Allan Block fills behind the blocks with organic soil instead of stone. Add a perforated drain pipe on wet sites or taller walls.
Does a block retaining wall need a concrete footing?
Segmental walls normally sit on a compacted gravel leveling pad at least 6 in thick, not a poured footing. CMHA notes that, as flexible structures, they do not need to go below the frost line if the foundation has enough bearing capacity.
How far apart should terraced retaining walls be?
CMHA says the horizontal distance between two terraces must be at least twice the height of the lower wall for them to act independently. Closer terraces are designed as one taller wall, which may need an engineer and a permit.
When does a retaining wall need geogrid?
When it is taller than the block maker allows for a gravity wall, typically 3 to 4 ft, or lower with poor soil, a slope or a load above it. Geogrid length and spacing come from a design for your site, not from a rule of thumb.
Sources
- CMHA: What Height Restrictions Should I Be Aware of With Segmental Retaining Wall Construction? (SRW-FAQ-001-14)cmha.org
- CMHA: Guide to Segmental Retaining Walls (SRW-TEC-005-09)cmha.org
- Mohave County, Arizona: Work Exempt from a Building Permitmohave.gov
- 2025 California Residential Code R404.4: when is engineered design required (gocodebook, reproduction of the code text)gocodebook.com
- City of Renton, Washington: Retaining Wallsrentonwa.gov
- Allan Block: Basic Installationallanblock.com
- Belgard: Calculating the Maximum Gravity Wall Height for Segmental Retaining Wallsbelgardcommercial.com
- Common Ground Alliance: 811 Before You Dig811beforeyoudig.com