The layers under a paver patio
A paver surface is a flexible pavement: the pavers carry loads into a bed of sand, the sand into a compacted stone base, and the base into the soil. The figures below come from the Concrete Masonry and Hardscapes Association (CMHA), which now publishes the former Interlocking Concrete Pavement Institute (ICPI) guidelines, in its tech note on building interlocking concrete pavements (PAV-TEC-002, revised 2022).
| Layer | Patio or walkway | Residential driveway |
|---|---|---|
| Joint sand | ASTM C144 sand in 1/16 to 3/16 in joints | Same |
| Pavers | As made | At least 2 3/8 in (60 mm) thick (CMHA PAV-TEC-009) |
| Bedding sand | Nominal 1 in, screeded loose, ASTM C33 | Same |
| Compacted base | At least 4 in on well-drained soil | At least 6 in on well-drained soil |
| Geotextile | Optional, for example over clay or moist silty soil | Same |
| Soil | Compacted, firm | Same |
Those base figures are minimums for soil that drains. On clay, in a wet spot or where the ground freezes hard, the base goes deeper; County Materials, a paver maker, puts it simply: base stone depth varies with soil type, climate, load and water table. Ask your paver supplier what works on your soil.
How deep to dig
The excavation depth is the sum of the layers, minus the small amount the pavers sink when you compact them. County Materials says the plate compactor settles pavers about 3/8 in into the bedding sand.
Dig depth below finished surface = base + 1 in sand + paver thickness − 3/8 in
| Use | Base | Dig depth |
|---|---|---|
| Patio or walkway, well-drained soil | 4 in | 7 in |
| Residential driveway, well-drained soil | 6 in | 9 in |
Check the thickness of the paver you buy, because patio pavers come in several. Dig wider than the finished patio too: County Materials extends the base at least 6 in beyond the edge of the pavers, or as far as the base is deep, so the edge restraint sits on stone. CMHA's guide specification puts restraint spikes at least one base thickness in from the outside edge of the base.
Step by step: laying the pavers
- Call 811 and lay out. The Common Ground Alliance says anyone who plans to dig should contact 811, the free before-you-dig service, a few business days ahead. Mark the outline with stakes and string. For a square corner, County Materials uses the 3-4-5 rule: 3 ft on one line, 4 ft on the other, and the diagonal is 5 ft when the angle is right.
- Excavate and set the slope. Dig to the depth above, and give the soil the same fall the finished surface will have. CMHA asks for a slope of at least 1.5%; point it away from the house.
- Compact the soil. Run a plate compactor over the subgrade until it is firm. Add a geotextile on clay or moist silty soil if your supplier recommends it.
- Build the base in lifts. Spread crushed stone in lifts of 4 to 6 in and compact each one. The finished base should vary no more than 3/8 in under a 10 ft straightedge.
- Screed the bedding sand. Lay two 1 in outside diameter pipes on the base, spread concrete sand, and pull a straight board across the pipes. Remove the pipes and fill their grooves. Do not compact the sand.
- Lay the pavers. Start at a straight edge or a square corner. Keep joints between 1/16 and 3/16 in, and check your lines with a string as you go.
- Cut and restrain the edges. Fill every gap over 3/8 in with a cut piece, using a splitter or a masonry saw. Fix the edge restraint (CMHA lists aluminum, steel, plastic or concrete as typical) into the base. CMHA says restraints are typically installed before the bedding sand and pavers are laid, so set them first wherever the edge is straight, and before final compaction where cut pavers form the edge.
- Compact and fill the joints. Run the plate compactor over the pavers at least twice to seat them, sweep dry joint sand in, and compact again until the joints are full. CMHA expects two or three passes for the joint sand; its guide specification says at least four.
Compaction rule: CMHA's guide specification says not to compact within 6 ft of an edge that has no restraint yet. Fix the edges first, then compact the whole surface.
Worked example: a 12 × 14 ft patio
A 12 ft by 14 ft patio with 6 × 9 in pavers, 4 in of base, 1 in of bedding sand and 10% extra for cuts, as entered in the paver calculator:
- Area: 12 × 14 = 168 sq ft
- Pavers: 168 ÷ 0.375 sq ft = 448 exact, and 184.8 ÷ 0.375 = 492.8, so 493 to order with 10% extra
- Base under the pavers: 168 × 4 ÷ 12 = 56 cu ft, or 2.07 cubic yards (about 2.90 tons at 1.4 tons per cubic yard)
- Bedding sand: 168 × 1 ÷ 12 = 14 cu ft, or 0.52 cubic yards (about 0.67 tons at 1.3 tons per cubic yard, or 28 bags of 0.5 cu ft)
- Dig depth with 2 3/8 in pavers: 7 in below the finished surface
- Fall at 1.5% over the 12 ft run away from the house: 12 × 12 in × 0.015 = 2.2 in
The calculator sizes the base under the pavers only. With the base extended 6 in past every edge, the stone covers 13 × 15 = 195 sq ft, which is 65 cu ft, or 2.41 cubic yards (about 3.37 tons) at 4 in. Run that footprint through the gravel calculator before you order, and add a margin because crushed stone compacts.
County Materials gives 2% (1/4 in per ft) as its minimum pitch, which would be 2.9 in over the same 12 ft. Both are minimums; the point is to move water away from the house.
Pavers and materials for common patio sizes
All rows use 10% extra for cuts, a 4 in base and 1 in of bedding sand under the paved area, computed with the same code as the paver calculator. Measure odd shapes with the square footage calculator first.
| Patio | 4 × 8 in pavers | 6 × 9 in pavers | Base, cubic yards | Sand, cubic yards |
|---|---|---|---|---|
| 10 × 10 ft (100 sq ft) | 495 | 294 | 1.23 | 0.31 |
| 12 × 12 ft (144 sq ft) | 713 | 423 | 1.78 | 0.44 |
| 12 × 14 ft (168 sq ft) | 832 | 493 | 2.07 | 0.52 |
| 16 × 16 ft (256 sq ft) | 1,268 | 751 | 3.16 | 0.79 |
| 20 × 20 ft (400 sq ft) | 1,980 | 1,174 | 4.94 | 1.23 |
The sand column is bedding sand only. Joint sand is a separate, smaller purchase, and polymeric joint sand has its own coverage and its own rules for water and weather: follow the bag. For loose bulk sand by the ton, the sand calculator converts the volume.
Mistakes that make pavers sink or shift
- A base that is thin or loose. Dumping 6 in of stone and compacting once leaves it soft underneath. Compact in lifts of 4 to 6 in.
- Too much bedding sand. The sand is a setting bed, not a leveling layer. Fix low spots in the base, not with extra sand; CMHA keeps the bed at a nominal 1 in.
- Compacting the sand before laying. The bedding sand stays loose until the pavers are on it, then gets compacted with them.
- No edge restraint. Without it, the outer rows creep outward and the joints open up. Restrain the open edges; a wall or curb can do the job where it is already in place.
- Slivers at the edges. Shift the pattern so cuts are larger, and fill every gap over 3/8 in. On driveways, CMHA's guide specification keeps cuts exposed to tires at one third of a paver or more.
- A flat surface. Without a fall of at least 1.5%, water sits on the patio and soaks the base.
Planning a raised patio or a terraced yard? The wall comes first: see how to build a retaining wall. For a quick check of the slope you laid, the slope calculator turns rise and run into a percentage.
Frequently asked questions
How deep do I dig for a paver patio?
Add the compacted base, the 1 in of bedding sand and the paver thickness, then subtract about 3/8 in for the pavers settling into the sand. With a 4 in base and 2 3/8 in pavers, that is 7 in below the finished surface.
Should I compact the sand before laying pavers?
No. CMHA has the bedding sand screeded to an uncompacted 1 in layer. It is compacted only once the pavers are on it, when the plate compactor seats them.
Can I lay pavers directly on dirt?
Not if you want them to stay flat. The trade guideline is a compacted crushed stone base of at least 4 in under a patio or walkway on well-drained soil, with 1 in of bedding sand on top.
Which way should a paver patio slope?
Away from the house, at a minimum of 1.5% according to CMHA; County Materials uses 2%, or about 1/4 in per foot. On a 12 ft patio that is a drop of 2.2 to 2.9 in.
Do I need edge restraints for a paver patio?
Yes. CMHA lists aluminum, steel, plastic and concrete as typical edge restraints, installed along the edges before the final compaction, which should not run within 6 ft of an unrestrained edge. Without restraint, pavers drift outward and joints open.
Sources
- CMHA: Construction of Interlocking Concrete Pavements (PAV-TEC-002-22)cmha.org
- CMHA: Guide Specification for the Construction of Interlocking Concrete Pavement (PAV-TEC-009-13)cmha.org
- County Materials: Installation Guidelines, Interlocking Concrete Pavers and Slabshub.countymaterials.com